Welch-allyn RL-150 Rhinolaryngoscope - User Manual Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Équipement Welch-allyn RL-150 Rhinolaryngoscope - User Manual. Welch Allyn RL-150 Rhinolaryngoscope - User Manual User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 2 - Table of Contents

TESTDANGER0.10.20.30.40Cleaning (continued)Perform Leak Test ProcedureThe leakage test allows for a simple two stage test of the water tight integrity

Page 3 - Components

Cleaning (continued)3. Pressurize the scope by pumping the hand bulb until the indicator on the gauge is in the green zone. DO NOT pressurize into the

Page 4 - Nomenclature

Cleaning (continued)NOTE: Never connect or disconnect the leakage tester under water.This will allow water into the instrument and leakage tester.4. I

Page 5 - System Set Up

Disinfection (continued)2. The instrument should remain in contact with the disinfecting solution for the time period recommended by the manufacturer

Page 6 - System Inspection

Disinfection (continued)Disinfecting SolutionsSpecific reference to brand names is not an endorsement of their efficacyas a disinfecting solution. Tes

Page 7 - System Inspection (continued)

Sterilization And Aeration (continued) 2. Following ETO Gas Sterilization, aeration time of 72 hours at room temperature is required.3. Aeration Chamb

Page 8 - Operation

4341 State Street RoadSkaneateles Falls, NY 13153315-685-4560800-535-6663Printed in U.S.A. Part No. 650033 Rev. C

Page 9 - Immediately After Procedure…

Thank you for purchasing the Welch Allyn RL-150™ Rhino-laryngoscope. The operating and maintenance instructionsfound in this manual should be followed

Page 10 - Stage-One Test

SpecificationsAngle of View ...75°Depth of Field...3-50 mmDiopter...+2 to -8 diopterTip De

Page 11 - Cleaning (continued)

NomenclatureRL-150 Rhinolaryngoscope2LX-150 Light SourceDiopterAdjustmentRingAngulationLeverUmbilicalCordPowerSwitchAirSwitchIlluminationControlEndosc

Page 12 - Disinfection

Prior to Initial UseBefore set up and inspection of the equipment, check all componentsreceived against the list of components (see Components section

Page 13 - Disinfection (continued)

System Set Up (continued)Light Source (See Light Source Manual for complete instructions.)1. Plug power cord into the receptacle on the back of the ca

Page 14 - Sterilization and Aeration

System Inspection (continued)Inspection of Light Guides and Optics1. With the light source lamp on, hold distal tipapproximately 40 mm from any printe

Page 15 - Cold Sterilization

OperationProcedureThe methods and techniques of rhinopharynlaryngoscopy are well-definedand documented. Endoscopy training seminars and programs are a

Page 16 -

CleaningEndoscopic instruments should be cleaned immediately after each use.Endoscopes are delicate and will degrade if not cleaned promptly, due toth

Commentaires sur ces manuels

Pas de commentaire